[{"data":1,"prerenderedAt":340},["ShallowReactive",2],{"schema:\u002Fbusiness-energy\u002Fguides\u002Fenergy-cost-optimisation-how-to-cut-non-commodity-charges-on-your-business-energy-bills\u002F":3},{"elements":4,"system":335},{"post__title":5,"post__summary":9,"post__content":12,"post__author":110,"post__reviewer":182,"publish_date":186,"updated_date":191,"url":193,"seo__meta_title":196,"seo__meta_description":198,"seo__add_no_index_tag":199,"seo__canonical_url":202,"related_articles":204,"categories":208,"subfolder":273,"tags":305,"thumbnail_image":309,"show_on_index_page":317,"hide_author":323,"hide_reviewer":327,"hide_tags":331},{"name":6,"type":7,"value":8},"Title","text","Energy cost optimisation. How to cut non-commodity charges on your business energy bills",{"name":10,"type":7,"value":11},"Summary","Here’s how to cut the non‑commodity part of your business energy bills – from capacity and TCR band reviews to load shifting, power factor correction, and better metering.",{"images":13,"linkedItemCodenames":20,"linkedItems":29,"links":106,"name":107,"type":108,"value":109},[14],{"description":15,"imageId":16,"url":17,"height":18,"width":19},"Business owner checks his utility bill in front of a laptop in his office. The caption reads: Energy cost optimisation guide: how to cut non‑commodity charges","38132105-4aad-4d6c-b1a5-2dd126214e87","https:\u002F\u002Fassets-eu-01.kc-usercontent.com:443\u002F77bbf83a-1306-0152-fea5-3b5eaf937634\u002Fc49b96ff-ff1e-4634-b264-02e856b64e27\u002FBionic%20Energy%20Guide%20Images%20%2812%29.webp",1080,2048,[21,22,23,24,25,26,27,28],"eeb0a39a_a979_0191_0018_2772aae5cc8a","n73803911_4b17_01b1_c91f_0e048b000059","n98a9abb9_9d75_015b_93ce_adbd82fd01dc","n781696f0_6bcb_011d_1109_8e3dbd17a095","n3ede372f_13d8_0165_7fc8_182d7c6bee5e","n3317c2da_c3a2_010b_ff91_63c14dd59366","c8a83983_24f8_01a9_0a7a_e732f8e9d8d2","n5e9546ad_5326_017b_78ae_c06fc773e633",[30,45,54,63,72,81,90,99],{"elements":31,"system":38},{"text":32,"anchor_id":35},{"name":33,"type":7,"value":34},"Text","What are non‑commodity energy costs?",{"name":36,"type":7,"value":37},"Anchor ID","what-are-non‑commodity-energy-costs",{"codename":21,"collection":39,"id":40,"language":39,"lastModified":41,"name":40,"sitemapLocations":42,"type":43,"workflowStep":44,"workflow":44},"default","eeb0a39a-a979-0191-0018-2772aae5cc8a","2026-05-07T08:55:29.8045133Z",[],"anchor_tag",null,{"elements":46,"system":51},{"text":47,"anchor_id":49},{"name":33,"type":7,"value":48},"Optimising your agreed capacity (kVA) ",{"name":36,"type":7,"value":50},"optimising-your-agreed capacity-kva",{"codename":22,"collection":39,"id":52,"language":39,"lastModified":41,"name":52,"sitemapLocations":53,"type":43,"workflowStep":44,"workflow":44},"73803911-4b17-01b1-c91f-0e048b000059",[],{"elements":55,"system":60},{"text":56,"anchor_id":58},{"name":33,"type":7,"value":57},"Getting your TCR band and site data right ",{"name":36,"type":7,"value":59},"getting-your-tcr-band-and-site-data-right ",{"codename":23,"collection":39,"id":61,"language":39,"lastModified":41,"name":61,"sitemapLocations":62,"type":43,"workflowStep":44,"workflow":44},"98a9abb9-9d75-015b-93ce-adbd82fd01dc",[],{"elements":64,"system":69},{"text":65,"anchor_id":67},{"name":33,"type":7,"value":66},"Practical ways to cut non‑commodity costs ",{"name":36,"type":7,"value":68},"practical-ways-to-cut-non‑commodity-costs ",{"codename":24,"collection":39,"id":70,"language":39,"lastModified":41,"name":70,"sitemapLocations":71,"type":43,"workflowStep":44,"workflow":44},"781696f0-6bcb-011d-1109-8e3dbd17a095",[],{"elements":73,"system":77},{"video":74},{"name":75,"type":7,"value":76},"Youtube Video","qba2NixUyXA",{"codename":25,"collection":39,"id":78,"language":39,"lastModified":41,"name":78,"sitemapLocations":79,"type":80,"workflowStep":44,"workflow":44},"3ede372f-13d8-0165-7fc8-182d7c6bee5e",[],"video_tag",{"elements":82,"system":87},{"text":83,"anchor_id":85},{"name":33,"type":7,"value":84},"Example non‑commodity optimisation checklist",{"name":36,"type":7,"value":86},"example-non‑commodity-optimisation-checklist",{"codename":26,"collection":39,"id":88,"language":39,"lastModified":41,"name":88,"sitemapLocations":89,"type":43,"workflowStep":44,"workflow":44},"3317c2da-c3a2-010b-ff91-63c14dd59366",[],{"elements":91,"system":96},{"text":92,"anchor_id":94},{"name":33,"type":7,"value":93},"Energy cost optimisation FAQs",{"name":36,"type":7,"value":95},"energy-cost-optimisation-faqs ",{"codename":27,"collection":39,"id":97,"language":39,"lastModified":41,"name":97,"sitemapLocations":98,"type":43,"workflowStep":44,"workflow":44},"c8a83983-24f8-01a9-0a7a-e732f8e9d8d2",[],{"elements":100,"system":103},{"video":101},{"name":75,"type":7,"value":102},"YggONGqNalY",{"codename":28,"collection":39,"id":104,"language":39,"lastModified":41,"name":104,"sitemapLocations":105,"type":80,"workflowStep":44,"workflow":44},"5e9546ad-5326-017b-78ae-c06fc773e633",[],[],"Content","rich_text","\u003Cp>Non‑commodity&nbsp;charges make up&nbsp;a large part of your&nbsp;\u003Ca href=\"https:\u002F\u002Fbionic.co.uk\u002Fbusiness-energy\u002Fbusiness-electricity\u002F\">business&nbsp;electricity\u003C\u002Fa>&nbsp;bills, often 50% to&nbsp;60% or more of total costs. Switching to a&nbsp;fixed&nbsp;contract with a lower unit rate should help to lower your bills, but&nbsp;this&nbsp;may not&nbsp;affect the&nbsp;non-commodity costs&nbsp;unless&nbsp;they’re&nbsp;also fixed (some suppliers include these as a variable cost).&nbsp;&nbsp;\u003C\u002Fp>\n\u003Cp>The good news is you can reduce these costs through smarter capacity,&nbsp;network&nbsp;and billing decisions.&nbsp;\u003C\u002Fp>\n\u003Cp>This guide walks you through practical&nbsp;steps to optimise the&nbsp;non‑commodity&nbsp;part of your bill,&nbsp;to help you keep&nbsp;some&nbsp;control as charges rise over the coming years.&nbsp;\u003C\u002Fp>\n\u003Cfigure data-asset-id=\"38132105-4aad-4d6c-b1a5-2dd126214e87\" data-image-id=\"38132105-4aad-4d6c-b1a5-2dd126214e87\">\u003Cimg src=\"https:\u002F\u002Fassets-eu-01.kc-usercontent.com:443\u002F77bbf83a-1306-0152-fea5-3b5eaf937634\u002Fc49b96ff-ff1e-4634-b264-02e856b64e27\u002FBionic%20Energy%20Guide%20Images%20%2812%29.webp\" data-asset-id=\"38132105-4aad-4d6c-b1a5-2dd126214e87\" data-image-id=\"38132105-4aad-4d6c-b1a5-2dd126214e87\" alt=\"Business owner checks his utility bill in front of a laptop in his office. The caption reads: Energy cost optimisation guide: how to cut non‑commodity charges\">\u003C\u002Ffigure>\n\u003Ch2>Five-point summary&nbsp;on energy optimisation&nbsp;\u003C\u002Fh2>\n\u003Col>\n  \u003Cli>\u003Ca href=\"https:\u002F\u002Fbionic.co.uk\u002Fbusiness-energy\u002Fguides\u002Fnon-commodity-costs-energy-triad-period\u002F\">Non‑commodity&nbsp;charges\u003C\u002Fa>&nbsp;(network, policy, balancing, and metering costs) already make up&nbsp;a large&nbsp;part&nbsp;of a typical UK&nbsp;business energy&nbsp;bill, so optimising these is just as important as getting a good unit rate.&nbsp;\u003C\u002Fli>\n  \u003Cli>Reviewing your agreed capacity (kVA) using at least 12 months of&nbsp;half-hourly&nbsp;data can cut unnecessary fixed charges, especially where capacity has been set on historic peaks.&nbsp;\u003C\u002Fli>\n  \u003Cli>Checking your TCR band, meter profile and site details, and correcting any errors with your supplier or DNO, helps ensure you are not overpaying fixed network charges after Ofgem’s Targeted Charging Review.&nbsp;\u003C\u002Fli>\n  \u003Cli>Practical&nbsp;on‑site&nbsp;actions like shifting load away from 4&nbsp;pm to&nbsp;7&nbsp;pm peaks, improving power factor, and using voltage optimisation where&nbsp;appropriate can&nbsp;all reduce&nbsp;kVA‑based&nbsp;and&nbsp;per‑kWh&nbsp;non‑commodity&nbsp;costs.&nbsp;\u003C\u002Fli>\n  \u003Cli>Strong governance – including regular capacity reviews, annual TCR and tariff validation, monthly bill checks, and making full use of CCL, CCA and charity reliefs – turns&nbsp;non‑commodity&nbsp;charges into a controlled, optimised cost line.&nbsp;\u003C\u002Fli>\n\u003C\u002Fol>\n\u003Cobject type=\"application\u002Fkenticocloud\" data-type=\"item\" data-rel=\"component\" data-codename=\"eeb0a39a_a979_0191_0018_2772aae5cc8a\">\u003C\u002Fobject>\n\u003Ch2>What&nbsp;are non‑commodity&nbsp;energy costs?\u003C\u002Fh2>\n\u003Cp>Your business electricity bill&nbsp;is split&nbsp;into two main parts: the commodity cost (the power you use) and the&nbsp;non‑commodity&nbsp;cost (everything else needed to get that power to your site).&nbsp;\u003C\u002Fp>\n\u003Cp>For&nbsp;many&nbsp;businesses,&nbsp;non‑commodity&nbsp;charges already account for around 60% of the \u003Ca href=\"https:\u002F\u002Fbionic.co.uk\u002Fbusiness-energy\u002Fbusiness-electricity\u002F\">electricity\u003C\u002Fa> bill and&nbsp;roughly 40%&nbsp;of the \u003Ca href=\"https:\u002F\u002Fbionic.co.uk\u002Fbusiness-energy\u002Fbusiness-gas\u002F\">gas \u003C\u002Fa>bill, and this share&nbsp;is expected&nbsp;to grow further towards 80% over the next decade.&nbsp;\u003C\u002Fp>\n\u003Cp>Non‑commodity&nbsp;costs typically include:&nbsp;\u003C\u002Fp>\n\u003Cul>\n  \u003Cli>\u003Cstrong>Network charges\u003C\u002Fstrong>&nbsp;-&nbsp;\u003Ca href=\"https:\u002F\u002Fbionic.co.uk\u002Fbusiness-energy\u002Fguides\u002Fmarket-insights\u002Ftnuos-and-duos-charges-explained\u002F\">DUoS&nbsp;and&nbsp;TNUoS\u003C\u002Fa>&nbsp;for use of the distribution and transmission systems.&nbsp;\u003C\u002Fli>\n  \u003Cli>\u003Cstrong>Balancing and system costs\u003C\u002Fstrong>&nbsp;- Charges such as&nbsp;BSUoS&nbsp;that keep the grid stable.&nbsp;\u003C\u002Fli>\n  \u003Cli>\u003Cstrong>Policy and environmental levies\u003C\u002Fstrong>&nbsp;-&nbsp;RO,&nbsp;FiT,&nbsp;CfD, Capacity Market,&nbsp;CCL&nbsp;and the Nuclear RAB scheme.&nbsp;\u003C\u002Fli>\n  \u003Cli>\u003Cstrong>Metering and data\u003C\u002Fstrong>&nbsp;-&nbsp;metering, data collection and aggregation, and sometimes&nbsp;third-party&nbsp;management fees.&nbsp;\u003C\u002Fli>\n\u003C\u002Ful>\n\u003Cp>As Ofgem’s&nbsp;\u003Ca href=\"https:\u002F\u002Fbionic.co.uk\u002Fbusiness-energy\u002Fguides\u002Fstanding-charges\u002F\">Targeted Charging Review (TCR)\u003C\u002Fa>&nbsp;reshapes how residual network charges&nbsp;are recovered&nbsp;by&nbsp;moving more costs into fixed standing charges linked to capacity and site banding.&nbsp;It’s&nbsp;potentially&nbsp;more important than ever to check that your site details are correct and optimised.&nbsp;\u003C\u002Fp>\n\u003Cobject type=\"application\u002Fkenticocloud\" data-type=\"item\" data-rel=\"component\" data-codename=\"n73803911_4b17_01b1_c91f_0e048b000059\">\u003C\u002Fobject>\n\u003Ch2>Optimising your agreed capacity (kVA)&nbsp;\u003C\u002Fh2>\n\u003Cp>Your agreed supply capacity (kVA) is the&nbsp;maximum&nbsp;electrical load your site&nbsp;is allowed&nbsp;to draw from the grid, and you pay for this capacity whether you use it or not.&nbsp;&nbsp;\u003C\u002Fp>\n\u003Cp>It's&nbsp;important to check that&nbsp;this information is up to date and not&nbsp;set on historic peaks that no longer apply. This is especially important if&nbsp;you’ve&nbsp;never revisited capacity after changing equipment or operating patterns.&nbsp;\u003C\u002Fp>\n\u003Cp>A simple capacity review looks like this:&nbsp;\u003C\u002Fp>\n\u003Col>\n  \u003Cli>Collect at least 12 months of&nbsp;half‑hourly&nbsp;demand data from your supplier or data collector.&nbsp;\u003C\u002Fli>\n  \u003Cli>Identify&nbsp;your true peak demand, typical operating&nbsp;demand&nbsp;and any seasonal variations.&nbsp;\u003C\u002Fli>\n\u003C\u002Fol>\n\u003Cul>\n  \u003Cli>Compare your highest peak with your contracted kVA and add a safe headroom (often around 10%) to allow for growth and abnormal days.&nbsp;\u003C\u002Fli>\n\u003C\u002Ful>\n\u003Cp>If your contracted capacity is significantly higher than this safe level, you may be able to reduce it and cut both capacity and&nbsp;network‑related&nbsp;non‑commodity&nbsp;charges.&nbsp;&nbsp;\u003C\u002Fp>\n\u003Cp>At the same time,&nbsp;demand‑side&nbsp;measures such as staggering&nbsp;start‑up&nbsp;times for heavy equipment, avoiding simultaneous use of large loads, and setting internal peak targets can keep your maximum demand under control.&nbsp;\u003C\u002Fp>\n\u003Cobject type=\"application\u002Fkenticocloud\" data-type=\"item\" data-rel=\"component\" data-codename=\"n98a9abb9_9d75_015b_93ce_adbd82fd01dc\">\u003C\u002Fobject>\n\u003Ch2>Getting your TCR band and site data right&nbsp;\u003C\u002Fh2>\n\u003Cp>Under Ofgem’s Targeted Charging Review, businesses&nbsp;are grouped&nbsp;into TCR bands based&nbsp;largely on&nbsp;capacity and connection details, and these bands drive&nbsp;a big chunk&nbsp;of fixed network charges.&nbsp;&nbsp;\u003C\u002Fp>\n\u003Cp>If your band, profile&nbsp;class&nbsp;or voltage level is wrong, you could be paying more than you should.&nbsp;\u003C\u002Fp>\n\u003Cp>A basic TCR and site data health check should cover:&nbsp;\u003C\u002Fp>\n\u003Cul>\n  \u003Cli>Your current TCR band and how it&nbsp;is applied&nbsp;to your \u003Ca href=\"https:\u002F\u002Fbionic.co.uk\u002Fbusiness-energy\u002Fguides\u002Fbusiness-energy-bills\u002F\">business energy bill\u003C\u002Fa>\u003C\u002Fli>\n  \u003Cli>Meter profile class (for example,&nbsp;\u003Ca href=\"https:\u002F\u002Fbionic.co.uk\u002Fbusiness-energy\u002Fguides\u002Felectricity-meter\u002Fhalf-hourly-meters\u002F\">half‑hourly meter\u003C\u002Fa>&nbsp;vs&nbsp;non‑half‑hourly meter)&nbsp;\u003C\u002Fli>\n  \u003Cli>Connection voltage level and whether it matches your actual supply\u003C\u002Fli>\n  \u003Cli>Recent operational changes, such as new production lines, longer hours, or partial site closures\u003C\u002Fli>\n\u003C\u002Ful>\n\u003Cp>If anything looks out of line with your actual usage and site type, you can&nbsp;ask for it to&nbsp;be checked&nbsp;again&nbsp;or reclassified. You can also correct incorrect data with your DNO or supplier.&nbsp;&nbsp;\u003C\u002Fp>\n\u003Cp>In&nbsp;some&nbsp;cases,&nbsp;making sure&nbsp;your agreed capacity&nbsp;is correct&nbsp;can also move you into a more&nbsp;appropriate TCR&nbsp;band and reduce fixed network charges over time.&nbsp;\u003C\u002Fp>\n\u003Cobject type=\"application\u002Fkenticocloud\" data-type=\"item\" data-rel=\"component\" data-codename=\"n781696f0_6bcb_011d_1109_8e3dbd17a095\">\u003C\u002Fobject>\n\u003Ch2>Practical ways to cut&nbsp;non‑commodity&nbsp;costs&nbsp;\u003C\u002Fh2>\n\u003Cp>You cannot remove&nbsp;non‑commodity&nbsp;charges altogether, but you can reduce how&nbsp;much&nbsp;you pay and how exposed you are as they rise.&nbsp;Consider the following:&nbsp;\u003C\u002Fp>\n\u003Ch3>Shift load away from peak&nbsp;times&nbsp;\u003C\u002Fh3>\n\u003Cp>Network charges such as&nbsp;DUoS&nbsp;are often higher during late afternoon and early evening on weekdays, usually around 4&nbsp;pm to&nbsp;7&nbsp;pm. By moving flexible loads out of these windows, you reduce your peak demand, cut certain&nbsp;time‑banded&nbsp;charges&nbsp;and build resilience against future increases.&nbsp;\u003C\u002Fp>\n\u003Cp>Examples include:&nbsp;\u003C\u002Fp>\n\u003Cul>\n  \u003Cli>Running&nbsp;energy‑intensive&nbsp;processes overnight or earlier in the day, if safe to do so.&nbsp;\u003C\u002Fli>\n  \u003Cli>\u003Ca href=\"https:\u002F\u002Fbionic.co.uk\u002Fbusiness-energy\u002Fguides\u002Fefficiency-sustainability\u002Fev-charging-and-energy-management-for-small-businesses\u002F\">Charging EVs\u003C\u002Fa>, forklifts or battery systems during&nbsp;off‑peak&nbsp;periods.&nbsp;\u003C\u002Fli>\n  \u003Cli>Pre‑heating&nbsp;or&nbsp;pre‑cooling&nbsp;buildings before peak windows so systems work less hard later.&nbsp;\u003C\u002Fli>\n\u003C\u002Ful>\n\u003Cp>Even&nbsp;relatively&nbsp;small&nbsp;changes, like&nbsp;avoiding all heavy equipment starting at 8&nbsp;am or 4&nbsp;pm,&nbsp;can make a measurable difference to your&nbsp;non‑commodity&nbsp;spend over a year.&nbsp;For more information, \u003Ca href=\"https:\u002F\u002Fbionic.co.uk\u002Fbusiness-energy\u002Fguides\u002Ftime-of-use-tariffs\u002F\">check out our guide to time-of-use tariffs.\u003C\u002Fa>\u003C\u002Fp>\n\u003Ch3>Improve your power&nbsp;factor&nbsp;\u003C\u002Fh3>\n\u003Cp>A poor power factor means you draw more&nbsp;apparent&nbsp;power (kVA) than you really need. This&nbsp;pushes up&nbsp;capacity‑related&nbsp;non‑commodity&nbsp;charges and can lead to penalties.&nbsp;&nbsp;\u003C\u002Fp>\n\u003Cp>Many&nbsp;sites can&nbsp;benefit&nbsp;from power factor correction equipment that uses capacitors to reduce reactive power and improve efficiency towards a target of at least 0.95.&nbsp;\u003C\u002Fp>\n\u003Cp>If your bills show power factor penalties or your metering data reveals consistently low power factor, talk to an engineer or energy specialist about specifying and installing correction equipment.&nbsp;&nbsp;\u003C\u002Fp>\n\u003Cp>In&nbsp;many&nbsp;cases, the payback comes from lower&nbsp;kVA‑based&nbsp;charges and improved performance of motors and other inductive loads.&nbsp;\u003C\u002Fp>\n\u003Ch3>Use voltage optimisation where&nbsp;appropriate&nbsp;\u003C\u002Fh3>\n\u003Cp>Some&nbsp;sites receive a higher voltage than their equipment needs, which can lead to wasted energy, excess&nbsp;heat&nbsp;and short&nbsp;component&nbsp;life.&nbsp;\u003C\u002Fp>\n\u003Cp>\u003Ca href=\"https:\u002F\u002Fbionic.co.uk\u002Fbusiness-energy\u002Fguides\u002Fwhat-is-voltage-optimisation\u002F\">Voltage optimisation\u003C\u002Fa>&nbsp;technology reduces and stabilises the voltage to the ideal level. This&nbsp;lowers consumption and cuts the&nbsp;non‑commodity&nbsp;costs that&nbsp;are calculated&nbsp;per kWh.&nbsp;\u003C\u002Fp>\n\u003Cp>Voltage optimisation is not right for every site, but it can be effective where supply voltage is consistently high and loads are suitable. A simple site survey can confirm whether there is&nbsp;a strong case&nbsp;to install equipment and what level of savings to expect.&nbsp;\u003C\u002Fp>\n\u003Ch3>Optimise metering and data&nbsp;services&nbsp;\u003C\u002Fh3>\n\u003Cp>Incorrect or unnecessary metering arrangements can add avoidable fixed costs to your bill. Start by confirming that you have the correct meter type – for example,&nbsp;half‑hourly&nbsp;where usage justifies it, or&nbsp;non‑half‑hourly&nbsp;for simple, smaller sites.&nbsp;\u003C\u002Fp>\n\u003Cp>You should also:&nbsp;\u003C\u002Fp>\n\u003Cul>\n  \u003Cli>Remove redundant&nbsp;sub‑meters&nbsp;that serve closed areas or decommissioned equipment.&nbsp;\u003C\u002Fli>\n  \u003Cli>Check data collector and aggregator charges and benchmark them against the market.&nbsp;\u003C\u002Fli>\n  \u003Cli>Ensure that meter technical details and MPAN data are&nbsp;accurate&nbsp;and up to date.&nbsp;\u003C\u002Fli>\n\u003C\u002Ful>\n\u003Cp>Better metering&nbsp;can&nbsp;cut admin costs&nbsp;and give you the&nbsp;data you need for capacity reviews, load&nbsp;shifting&nbsp;and continuous optimisation.&nbsp;\u003C\u002Fp>\n\u003Ch3>Making the&nbsp;most of&nbsp;levies,&nbsp;reliefs&nbsp;and governance&nbsp;\u003C\u002Fh3>\n\u003Cp>Some&nbsp;policy‑related&nbsp;non‑commodity&nbsp;charges can&nbsp;be reduced&nbsp;if you qualify for exemptions or relief schemes.&nbsp;&nbsp;\u003C\u002Fp>\n\u003Cp>For example,&nbsp;\u003Ca href=\"https:\u002F\u002Fbionic.co.uk\u002Fbusiness-energy\u002Fguides\u002Fthe-climate-change-levy\u002F\">Climate Change Levy\u003C\u002Fa>&nbsp;discounts are available through Climate Change Agreements, and certain charities and&nbsp;public‑sector&nbsp;bodies can access reduced rates.&nbsp;\u003C\u002Fp>\n\u003Cp>Build a simple checklist that covers:&nbsp;\u003C\u002Fp>\n\u003Cul>\n  \u003Cli>CCL exemptions or reduced rates.&nbsp;\u003C\u002Fli>\n  \u003Cli>Eligibility for Climate Change Agreements if you are in an&nbsp;energy‑intensive&nbsp;sector.&nbsp;\u003C\u002Fli>\n  \u003Cli>Any charity&nbsp;or&nbsp;public‑sector&nbsp;reliefs that apply to your sites, such as the&nbsp;\u003Ca href=\"https:\u002F\u002Fbionic.co.uk\u002Fbusiness-energy\u002Fguides\u002Fvat-for-business-energy\u002F\">reduced rate of VAT\u003C\u002Fa>.&nbsp;\u003C\u002Fli>\n\u003C\u002Ful>\n\u003Cp>Remember&nbsp;to continue with&nbsp;quarterly capacity reviews, annual TCR and tariff validation, monthly bill checks, and ongoing monitoring of demand peaks.&nbsp;&nbsp;\u003C\u002Fp>\n\u003Cp>Treat&nbsp;non‑commodity&nbsp;charges as a managed cost category, and you will&nbsp;be better placed&nbsp;to&nbsp;handle&nbsp;future changes, from rising&nbsp;TNUoS&nbsp;charges to new schemes like the \u003Ca href=\"https:\u002F\u002Fbionic.co.uk\u002Fbusiness-energy\u002Fguides\u002Fbilling-payments\u002Fregulated-asset-base-rab-nuclear-levy\u002F\">RAB nuclear levy\u003C\u002Fa>.&nbsp;\u003C\u002Fp>\n\u003Cobject type=\"application\u002Fkenticocloud\" data-type=\"item\" data-rel=\"component\" data-codename=\"n3ede372f_13d8_0165_7fc8_182d7c6bee5e\">\u003C\u002Fobject>\n\u003Cobject type=\"application\u002Fkenticocloud\" data-type=\"item\" data-rel=\"component\" data-codename=\"n3317c2da_c3a2_010b_ff91_63c14dd59366\">\u003C\u002Fobject>\n\u003Ch2>Example&nbsp;non‑commodity&nbsp;optimisation checklist&nbsp;\u003C\u002Fh2>\n\u003Cp>Here is a simple checklist you can apply across one or more sites to stay on top of&nbsp;non‑commodity&nbsp;costs.&nbsp;\u003C\u002Fp>\n\u003Ctable>\u003Ctbody>\n  \u003Ctr>\u003Ctd>\u003Cstrong>Focus area\u003C\u002Fstrong>&nbsp;\u003C\u002Ftd>\u003Ctd>\u003Cstrong>Key question to ask\u003C\u002Fstrong>&nbsp;\u003C\u002Ftd>\u003Ctd>\u003Cstrong>Typical action\u003C\u002Fstrong>&nbsp;\u003C\u002Ftd>\u003C\u002Ftr>\n  \u003Ctr>\u003Ctd>Capacity (kVA)&nbsp;\u003C\u002Ftd>\u003Ctd>Is contracted kVA much higher than true peak plus 10%? &nbsp;\u003C\u002Ftd>\u003Ctd>Reduce kVA, introduce demand management. &nbsp;\u003C\u002Ftd>\u003C\u002Ftr>\n  \u003Ctr>\u003Ctd>TCR band and site data&nbsp;\u003C\u002Ftd>\u003Ctd>Does banding match site size and usage profile? &nbsp;\u003C\u002Ftd>\u003Ctd>Request reclassification, correct MPAN and profile data. &nbsp;\u003C\u002Ftd>\u003C\u002Ftr>\n  \u003Ctr>\u003Ctd>Load profile&nbsp;\u003C\u002Ftd>\u003Ctd>Are big loads running in weekday 4–7pm windows? &nbsp;\u003C\u002Ftd>\u003Ctd>Shift flexible loads to&nbsp;off‑peak&nbsp;where possible. &nbsp;\u003C\u002Ftd>\u003C\u002Ftr>\n  \u003Ctr>\u003Ctd>Power factor&nbsp;\u003C\u002Ftd>\u003Ctd>Are there penalties or PF below 0.95? &nbsp;\u003C\u002Ftd>\u003Ctd>Install or service power factor correction. &nbsp;\u003C\u002Ftd>\u003C\u002Ftr>\n  \u003Ctr>\u003Ctd>Voltage levels&nbsp;\u003C\u002Ftd>\u003Ctd>Is incoming voltage consistently high? &nbsp;\u003C\u002Ftd>\u003Ctd>Assess and install voltage optimisation if suitable. &nbsp;\u003C\u002Ftd>\u003C\u002Ftr>\n  \u003Ctr>\u003Ctd>Metering and data&nbsp;\u003C\u002Ftd>\u003Ctd>Are metering and data charges clearly itemised? &nbsp;\u003C\u002Ftd>\u003Ctd>Rationalise meters, review DC\u002FDA contracts. &nbsp;\u003C\u002Ftd>\u003C\u002Ftr>\n  \u003Ctr>\u003Ctd>Levies and reliefs&nbsp;\u003C\u002Ftd>\u003Ctd>Are we claiming all valid exemptions? &nbsp;\u003C\u002Ftd>\u003Ctd>Apply for CCL, CCA or charity reliefs. &nbsp;\u003C\u002Ftd>\u003C\u002Ftr>\n  \u003Ctr>\u003Ctd>Governance and review cycle&nbsp;\u003C\u002Ftd>\u003Ctd>Do we review these items regularly? &nbsp;\u003C\u002Ftd>\u003Ctd>Set quarterly and annual review milestones. &nbsp;\u003C\u002Ftd>\u003C\u002Ftr>\n\u003C\u002Ftbody>\u003C\u002Ftable>\n\u003Cp>By working through this checklist, you turn&nbsp;non‑commodity&nbsp;charges from a confusing line on the bill into a managed, optimised cost that supports your wider energy and net zero strategy.&nbsp;\u003C\u002Fp>\n\u003Ch2>How Bionic can&nbsp;help&nbsp;\u003C\u002Fh2>\n\u003Cp>If you want expert support to put this guide into action, Bionic can help you make sense of rising&nbsp;non‑commodity&nbsp;costs and find the right business energy contract for your needs.&nbsp;&nbsp;\u003C\u002Fp>\n\u003Cp>Our&nbsp;tech‑enabled&nbsp;team compares quotes from a panel of trusted UK suppliers, talks you through the options&nbsp;without any jargon, and&nbsp;support you with the switch.&nbsp;&nbsp;\u003C\u002Fp>\n\u003Cp>All you need to&nbsp;get started&nbsp;is your business name and postcode – we use secure smart data to do the heavy lifting, so you can focus on running your business while we&nbsp;work on cutting&nbsp;your energy costs.&nbsp;\u003C\u002Fp>\n\u003Cobject type=\"application\u002Fkenticocloud\" data-type=\"item\" data-rel=\"component\" data-codename=\"c8a83983_24f8_01a9_0a7a_e732f8e9d8d2\">\u003C\u002Fobject>\n\u003Ch2>FAQs on energy cost optimisation&nbsp;\u003C\u002Fh2>\n\u003Cp>Still unsure what energy cost optimisation means for your business? Check out the answers to our most&nbsp;frequently&nbsp;asked questions:&nbsp;\u003C\u002Fp>\n\u003Ch3>Can an incorrect MPAN lead to higher non-commodity charges on my business energy bill?&nbsp;\u003C\u002Fh3>\n\u003Cp>Yes. If your MPAN&nbsp;contains&nbsp;errors in the profile class or distribution region digits, your TCR band and network charges may&nbsp;be miscalculated, meaning you could overpay until the data&nbsp;is corrected&nbsp;with your DNO or supplier.&nbsp;\u003C\u002Fp>\n\u003Ch3>Does my MPAN profile class affect how non-commodity costs&nbsp;are calculated?&nbsp;\u003C\u002Fh3>\n\u003Cp>Yes. Your profile class, encoded in the first two digits of your MPAN,&nbsp;determines&nbsp;how your consumption&nbsp;is estimated&nbsp;for billing purposes, which directly influences the network and balancing charges applied to your account.&nbsp;\u003C\u002Fp>\n\u003Ch3>Will my MPRN change if I switch to a different gas network operator or IGT?&nbsp;\u003C\u002Fh3>\n\u003Cp>No. Your MPRN&nbsp;is tied&nbsp;to the physical gas supply point at your premises, not your supplier or network operator, so it&nbsp;remains&nbsp;the same even if&nbsp;your supply is managed by an Independent Gas Transporter.&nbsp;\u003C\u002Fp>\n\u003Ch3>How does my MPAN relate to my agreed supply capacity (kVA)?&nbsp;\u003C\u002Fh3>\n\u003Cp>Your \u003Ca href=\"https:\u002F\u002Fbionic.co.uk\u002Fbusiness-energy\u002Fguides\u002Fmpan-mprn-numbers\u002F\">MPAN\u003C\u002Fa>&nbsp;identifies&nbsp;your supply point, and the capacity agreed at that point&nbsp;determines&nbsp;your maximum permitted demand. Reviewing both together is essential when reducing contracted kVA to cut fixed network charges.&nbsp;\u003C\u002Fp>\n\u003Cobject type=\"application\u002Fkenticocloud\" data-type=\"item\" data-rel=\"component\" data-codename=\"n5e9546ad_5326_017b_78ae_c06fc773e633\">\u003C\u002Fobject>\n\u003Ch3>What happens to my MPAN when Market-wide Half-Hourly Settlement (MHHS)&nbsp;is fully rolled&nbsp;out?&nbsp;\u003C\u002Fh3>\n\u003Cp>Under&nbsp;\u003Ca href=\"https:\u002F\u002Fbionic.co.uk\u002Fbusiness-energy\u002Fguides\u002Felectricity-meter\u002Fwhat-is-market-wide-half-hourly-settlement-mhhs\u002F\">MHHS\u003C\u002Fa>, the profile class information in the MPAN top line will change for&nbsp;many&nbsp;sites, as half-hourly settlement replaces estimated profiles.&nbsp;It’s&nbsp;important to verify your MPAN data&nbsp;is updated&nbsp;correctly during the transition.&nbsp;\u003C\u002Fp>\n\u003Ch3>Can having the wrong meter profile class on my MPAN result in me paying the wrong&nbsp;DUoS&nbsp;charges?&nbsp;\u003C\u002Fh3>\n\u003Cp>Yes. An incorrect profile class can place your site in the wrong settlement category, causing Distribution Use of System charges to&nbsp;be calculated&nbsp;on estimated rather than actual half-hourly data, potentially costing more than necessary.&nbsp;\u003C\u002Fp>\n\u003Ch3>If I take on a new business premises, how quickly should I confirm the MPAN and MPRN with a supplier?&nbsp;\u003C\u002Fh3>\n\u003Cp>You should confirm both numbers as soon as possible after taking on a property, as delays can leave you on&nbsp;deemed&nbsp;rates,&nbsp;typically the most expensive tariff a supplier offers,&nbsp;until a formal contract is in place.&nbsp;\u003C\u002Fp>\n\u003Ch3>Is there a link between my MPRN and the charges I pay for gas transportation?&nbsp;\u003C\u002Fh3>\n\u003Cp>Yes. Your MPRN&nbsp;identifies&nbsp;your gas supply point within the network, and that location&nbsp;determines&nbsp;which gas transporter's tariff applies to your site, which affects the transportation costs included in your overall gas bill.&nbsp;\u003C\u002Fp>",{"name":111,"type":112,"value":113,"linkedItems":115},"Author","modular_content",[114],"les_roberts",[116],{"elements":117,"system":175},{"name":118,"title":121,"linkedin":123,"twitter":126,"intro":129,"body":136,"slug":143,"image":147,"seo__meta_title":159,"seo__meta_description":162,"seo__add_no_index_tag":165,"seo__canonical_url":172},{"name":119,"type":7,"value":120},"Name","Les Roberts",{"name":6,"type":7,"value":122},"Senior Content Manager",{"name":124,"type":7,"value":125},"Linkedin Address","https:\u002F\u002Fwww.linkedin.com\u002Fin\u002Flesrobertsmedia\u002F",{"name":127,"type":7,"value":128},"Twitter Address","https:\u002F\u002Ftwitter.com\u002Fbionic_business",{"images":130,"linkedItemCodenames":131,"linkedItems":132,"links":133,"name":134,"type":108,"value":135},[],[],[],[],"Intro","\u003Cp>A diverse career path has seen Les move from seaside town tea shop owner to customer champion at MoneySuperMarket. And these two roles that have combined at Bionic where you’ll now find him writing about everything from how to start and run a café to rising energy prices.&nbsp;\u003C\u002Fp>",{"images":137,"linkedItemCodenames":138,"linkedItems":139,"links":140,"name":141,"type":108,"value":142},[],[],[],[],"Body","\u003Cp>A diverse career path has seen Les move from seaside town tea shop owner to customer champion at MoneySuperMarket. And these two roles that have combined at Bionic where you’ll now find him writing about everything from how to start and run a café to rising energy prices.&nbsp;\u003C\u002Fp>\n\u003Cp>Having experienced life as a busy business owner himself, Les understands how hectic things can get when running a business. That’s why he cuts through the jargon to make sure you get all the information you need in a way that’s easy to understand. Whether you need to know how current events will affect your business, the best way to set up a business bank account, or anything in between, Les will have written something about it.&nbsp;\u003C\u002Fp>",{"name":144,"type":145,"value":146},"Slug","url_slug","les-roberts\u002F",{"name":148,"type":149,"value":150},"Image","asset",[151],{"name":152,"description":153,"type":154,"size":155,"url":156,"width":157,"height":157,"renditions":158},"lesroberts-new.png","Les Roberts, Senior Content Manager at Bionic","image\u002Fpng",84731,"https:\u002F\u002Fassets-eu-01.kc-usercontent.com:443\u002F77bbf83a-1306-0152-fea5-3b5eaf937634\u002F69842c59-20c3-4c2d-a8c6-1befcae5f4dc\u002Flesroberts-new.png",287,{},{"name":160,"type":7,"value":161},"Meta title","Les Roberts | Content Manager | Bionic",{"name":163,"type":7,"value":164},"Meta description","With a background in business and consumer affairs, Les writes about everything from how current events will affect your business to the best way to set up a business bank account.",{"name":166,"type":167,"value":168},"Add no index tag","multiple_choice",[169],{"name":170,"codename":171},"No","no",{"name":173,"type":7,"value":174},"Canonical URL","https:\u002F\u002Fbionic.co.uk\u002Fauthors\u002Fles-roberts\u002F",{"codename":114,"collection":39,"id":176,"language":39,"lastModified":177,"name":178,"sitemapLocations":179,"type":180,"workflowStep":181,"workflow":39},"2cb817c0-35d8-4d8e-99ee-fd561e981d01","2024-10-09T09:22:44.1545356Z","AUTHOR - Les Roberts",[],"author","published",{"name":183,"type":112,"value":184,"linkedItems":185},"Reviewer",[],[],{"name":187,"type":188,"value":189,"displayTimeZone":190},"Publish Date","date_time","2026-05-06T23:00:00Z","Europe\u002FLondon",{"name":192,"type":188,"value":44,"displayTimeZone":190},"Updated Date",{"name":194,"type":145,"value":195},"URL","energy-cost-optimisation-how-to-cut-non-commodity-charges-on-your-business-energy-bills\u002F",{"name":160,"type":7,"value":197},"How Energy Cost Optimisation Can Help To cut Non-Commodity Charges 🦾",{"name":163,"type":7,"value":11},{"name":166,"type":167,"value":200},[201],{"name":170,"codename":171},{"name":173,"type":7,"value":203},"https:\u002F\u002Fbionic.co.uk\u002Fbusiness-energy\u002Fguides\u002Fbilling-payments\u002Fenergy-cost-optimisation-how-to-cut-non-commodity-charges-on-your-business-energy-bills\u002F",{"name":205,"type":112,"value":206,"linkedItems":207},"Related Articles",[],[],{"name":209,"type":112,"value":210,"linkedItems":212},"Categories",[211],"category___business_energy_guide",[213],{"elements":214,"system":267},{"name":215,"short_name":217,"call_to_action":220,"call_to_action_button":223,"mobile_name":226,"url_slug":229,"icon":232,"active_icon":241,"seo__meta_title":248,"seo__meta_description":250,"seo__add_no_index_tag":252,"seo__canonical_url":255,"type":257,"order":263},{"name":119,"type":7,"value":216},"Business Energy Guide",{"name":218,"type":7,"value":219},"Short Name","Business Energy",{"name":221,"type":7,"value":222},"Call To Action Title","Get a quote for business energy",{"name":224,"type":7,"value":225},"Call To Action Button Text","Start a quote",{"name":227,"type":7,"value":228},"Mobile Name","Energy",{"name":230,"type":145,"value":231},"URL SLug","business-energy",{"name":233,"type":149,"value":234},"Icon",[235],{"name":236,"description":237,"type":238,"size":239,"url":240,"renditions":44},"business-energy-orange.svg","Energy Icon","image\u002Fsvg+xml",5492,"https:\u002F\u002Fassets-eu-01.kc-usercontent.com:443\u002F77bbf83a-1306-0152-fea5-3b5eaf937634\u002Fe7af8fd3-1fae-4b4a-8e3a-fcb5b49954fd\u002Fbusiness-energy-orange.svg",{"name":242,"type":149,"value":243},"Active Icon",[244],{"name":245,"description":246,"type":238,"size":239,"url":247,"renditions":44},"business-energy-white.svg","Energy Icon White","https:\u002F\u002Fassets-eu-01.kc-usercontent.com:443\u002F77bbf83a-1306-0152-fea5-3b5eaf937634\u002F6f05ed3c-9e23-4a60-8879-cd0402bb0da9\u002Fbusiness-energy-white.svg",{"name":160,"type":7,"value":249},"Business Energy Guides | Business Gas and Electric | Bionic",{"name":163,"type":7,"value":251},"Bionic's business energy guides use our expert knowledge to cut through the jargon and help you find the best gas and electric deals for your business ",{"name":166,"type":167,"value":253},[254],{"name":170,"codename":171},{"name":173,"type":7,"value":256},"https:\u002F\u002Fbionic.co.uk\u002Fbusiness-energy\u002Fguides\u002F",{"name":258,"type":167,"value":259},"Type",[260],{"name":261,"codename":262},"Guide","guide",{"name":264,"type":265,"value":266},"Order","number",1,{"codename":211,"collection":39,"id":268,"language":39,"lastModified":269,"name":270,"sitemapLocations":271,"type":272,"workflowStep":181,"workflow":39},"6792dcae-3009-4c58-a113-f7827f7d0184","2024-03-12T12:30:12.9734149Z","Category - Business Energy Guide",[],"category",{"name":274,"type":112,"value":275,"linkedItems":277},"Subfolder",[276],"energy_subfolder___billing_and_payments",[278],{"elements":279,"system":299},{"name":280,"short_name":282,"url_slug":284,"url":287,"icon":289,"active_icon":291,"seo__meta_title":293,"seo__meta_description":294,"seo__add_no_index_tag":295,"seo__canonical_url":297,"order":298},{"name":119,"type":7,"value":281},"Billing and Payments",{"name":218,"type":7,"value":283},"",{"name":285,"type":145,"value":286},"URL Slug","billing-payments",{"name":194,"type":7,"value":288},"guides",{"name":233,"type":149,"value":290},[],{"name":242,"type":149,"value":292},[],{"name":160,"type":7,"value":281},{"name":163,"type":7,"value":281},{"name":166,"type":167,"value":296},[],{"name":173,"type":7,"value":283},{"name":264,"type":265,"value":44},{"codename":276,"collection":39,"id":300,"language":39,"lastModified":301,"name":302,"sitemapLocations":303,"type":304,"workflowStep":181,"workflow":39},"f4491256-0c9f-41ca-a73d-b8f4dbcbe42c","2025-10-23T08:56:41.8954615Z","ENERGY SUBFOLDER - Billing and Payments",[],"subfolder",{"name":306,"type":112,"value":307,"linkedItems":308},"Tags",[],[],{"name":310,"type":149,"value":311},"Thumbnail Image",[312],{"name":313,"description":15,"type":314,"size":315,"url":17,"width":19,"height":18,"renditions":316},"Bionic Energy Guide Images (12).webp","image\u002Fwebp",171644,{},{"name":318,"type":167,"value":319},"Show on index page",[320],{"name":321,"codename":322},"Yes","yes",{"name":324,"type":167,"value":325},"Hide Author",[326],{"name":170,"codename":171},{"name":328,"type":167,"value":329},"Hide Reviewer",[330],{"name":170,"codename":171},{"name":332,"type":167,"value":333},"Hide Tags",[334],{"name":321,"codename":322},{"codename":336,"collection":39,"id":337,"language":39,"lastModified":41,"name":338,"sitemapLocations":339,"type":262,"workflowStep":181,"workflow":39},"energy_guide___energy_cost_optimisation__how_to_cu","43eb77f1-ab87-448a-8095-2d50d3cf2c53","ENERGY GUIDE - Energy cost optimisation: how to cut non-commodity charges on your business energy bills",[],1784823010255]